Lions, elephants and qilin
Mark left and right, orientation and base position. Verify the placement plan before unpacking and lifting each piece.
EXPORT SHIPPING AND INSTALLATION
Overseas stonework must be made correctly, packed clearly and installed safely. This checklist connects factory approval, export packing, destination arrangements and on-site acceptance.
Request overall, front, side and detail photographs. For sets and multi-piece structures, confirm left-right orientation, component numbers, installation sequence and lifting points before the crates are closed.
Inscriptions, couplets, temple names and donor lists should be proofread before packing. Keep the approved files with the order record for arrival inspection.
Responsibilities and included services should be written in the quotation or contract.
| Packing | Reinforced wooden crates, internal cushioning, centre-of-gravity marks, component numbers, protection for fragile details and packing photos. |
|---|---|
| Container loading | Confirm piece and crate weights, dimensions, loading order, bracing and whether special equipment or an open-top container is required. |
| Destination | Confirm consignee, port, customs documents, taxes and duties, inland transport, site access and estimated arrival arrangements. |
| Insurance | State whether insurance is included, what it covers, exclusions, evidence required for claims and where responsibility transfers. |
| Installation | Confirm foundation capacity, crane and forklift access, placement direction, fixing points, installation sequence and acceptance photographs. |
DIFFERENT SHAPES NEED DIFFERENT CONTROLS
Mark left and right, orientation and base position. Verify the placement plan before unpacking and lifting each piece.
Number each section and record lifting points, centre of gravity, joint relationships and installation sequence.
Protect faces, tools, inscriptions, corners and burner openings. Photograph these details both before packing and during arrival inspection.
Each record answers a different question when a crate is opened or a component does not match the plan.
| 1. Factory approval | Approved drawings, dimensions, finish, inscriptions and dated inspection photographs. |
|---|---|
| 2. Packing list | Product code, component number, crate number, quantity, net weight and gross weight. |
| 3. Packing evidence | Photos before closing, internal supports, protection of fragile details and external markings. |
| 4. Container loading | Loading order, bracing, container number, seal number and photographs before the doors close. |
| 5. Arrival inspection | Condition of the container and crates, continuous unloading photos, visible damage and missing items. |
| 6. Installation handover | Component positions, fixing method, completed photographs and a record of remaining work. |
PROJECT QUESTIONS BEFORE ORDERING