Stone Carving Quotation Guide
A total price is not enough. Temple committees, heritage contractors and local dealers should first check whether two quotations include the same products, dimensions, stone, carving, packing and delivery scope.
A pair of stone lions may include or exclude pedestals. Dragon pillars may be one piece or sectioned, with shallow or deep carving. A paifang quotation may cover stone components only, or also drawings, packing, transport and installation support.
A useful quotation lets the decision maker see what is included, which assumptions were used and which costs remain outside the price.
Compare specifications and responsibilities before comparing totals.
| Finished dimensions | Height, width, diameter, base, thickness, quantity and sections. Volume and weight also affect stone, packing and transport. |
|---|---|
| Stone selection | Stone identification, colour range, block size, grain, sample approval and surface finish. |
| Design and carving | Reference style, number of figures or animals, relief depth, openwork, inscriptions and hand-finishing scope. |
| Drawings and changes | Production-ready drawings, revision rounds, old-piece survey, inscription checks and the treatment of later changes. |
| Packing and delivery | Crates, steel frames, marks, loading, origin port, destination port, insurance, customs, inland delivery and unloading. |
| Installation support | Foundation, crane, access equipment, installers, travel, local materials and responsibility for engineering checks. |
DEALER, CONTRACTOR AND TEMPLE COMMITTEE
Check drawing compliance, quotation validity, client-file confidentiality, approval records, packing marks and remedy terms.
Check foundations, reserved holes, joints, lifting points, installation sequence, schedule coordination and structural responsibility.
Check whether key products are complete, styles are coordinated, excluded costs are visible and work can be phased.
A lower total is not meaningful until the scope and exclusions are visible.
| Product | Quantity, finished dimensions, pedestal, accessories, component divisions and tolerance. |
|---|---|
| Material and carving | Approved stone, relief depth, openwork, hand finishing, inscriptions and surface finish. |
| Technical documents | Site measurement responsibility, shop drawings, structural information and revision allowance. |
| Delivery | Crates, inland transport, trade term, port, sea freight, insurance, customs and destination delivery. |
| Installation | Foundations, lifting equipment, local labour, consumables, remote guidance and on-site support. |
| After delivery | Inspection period, evidence required for damage, repair scope and replacement responsibilities. |
Common omissions include pedestals, deep relief, drawing revisions, reinforced crates, destination charges and lifting equipment. Ask each supplier to mark included, excluded and provisional items in writing.